Planning a new plant, a hall extension or a new production line in Poland? Mestil supports foreign investors as a local partner in the structural design of industrial facilities. We can join the project from the start or adapt a structure originally designed for another country.
Designed for another country?
We will adapt it to Polish requirements
We review the assumptions, calculations and documentation of the original design. We check which solutions can be reused and which need to be supplemented, recalculated or changed to meet Polish standards (Eurocodes with the Polish National Annexes), regulations and site conditions.
We do not stop at translating drawings or providing a formal signature. First we review the design and agree on the scope of adaptation. The structural part is prepared and signed by Polish engineers holding the required building licences, within the agreed scope of the commission.
A structure that fits the process
In an industrial plant, the structure has to reflect the requirements of the process: equipment loads, space for installation and maintenance, openings, suspended elements and the constraints of an operating facility.
We agree the design basis with the investor and the process engineers, define the input data we need and coordinate the structure with the other disciplines. Structures are our core field, but where needed we bring in trusted partners for architecture, HVAC and plumbing, electrical and road works – and agree their scope with the client.
Working with an international team
We work with investors, foreign design offices, local designers, contractors and technology suppliers. Consultations are held in Polish or English – online in Microsoft Teams, or in person at the client’s premises or at our office in Wrocław. We share models and documentation in Dalux and Autodesk Construction Cloud, and design in Revit, Tekla, Allplan and Advance Steel.
How we work together
- We discuss the investment: its location, stage and process requirements.
- We analyse the available drawings, models and calculations, and point out missing data.
- We agree the scope of work and check the design against Polish requirements.
- We coordinate the structure with the process and the other disciplines.
- We prepare the agreed documentation and discuss the next steps.
Experience in large industrial projects
For the Mercedes-Benz electric battery plant in Jawor, Mestil was responsible for the steel structure at the building permit stage, as well as for the working and shop drawings. The building covers 44,000 m² and the structure comprises 2,600 t of steel. The project was delivered in BIM, with documentation in Polish and English.
We have also worked for the Polish branches of international design and construction companies – for Takenaka Europe on the extension of the Mars Polska plant in Błonie, and for Arup Polska on the PepsiCo Frito Lay industrial complex in Środa Śląska. See our references.
Let’s talk about your investment
Send us the location, a short project description and any drawings or models you have. If you already have a structural design prepared for another country, attach it to your enquiry – we will define the data we need and the scope of support.
