Blog

We write about what structural projects actually stumble on: choosing a steel grade, weld symbols, buckling length, the sequence of assembly. Short pieces, with drawings from real jobs.

Most read

Welder figurines at an I-beam – illustration for the post on S355JR and S355J2 steel grades

S355 JR or J2 part 1

Which steel for the structure? It comes down to impact toughness at low temperature and to where the member works.

Read

Welder figurines at an I-beam – illustration for the post on S355JR and S355J2 steel grades

S355JR or S355J2 part 2

Part two: how to pick the grade when thickness grows and the design temperature drops below zero.

Read

All posts

Buckling length – failed so many times!

Buckling length – failed so many times!

Purlin-braced or the length between nodes? A case where the wrong value shifts the result by tens of percent.

Read

Structural Strengthening Under Full Load

Structural Strengthening Under Full Load

Blasting showed that over 70 percent of the column had corroded. The strengthening had to be designed without shutting the line down.

Read

ISO/AWS – the same weld, but different weld symbols

ISO/AWS – the same weld, but different weld symbols

What changes when your drawings go to a workshop working to American standards.

Read

Weld symbols

Weld symbols

The arrow points one way, the weld belongs the other. The most common mistake in shop drawings and where it comes from.

Read

3D scanning

3D scanning

Not every survey needs 3 mm accuracy. For quick measurements a handheld 3D camera and a set of printed targets are enough.

Read

Optical 3D scanning

Optical 3D scanning

An optical camera instead of a laser scanner. Example: a brace added to an existing platform, measured and fitted into the model.

Read

3D scan without a 3D scanner and… without a drone

3D scan without a 3D scanner and… without a drone

A 60-metre roof, a forest of chimneys and no documentation. A survey without a scanner and without a drone.

Read

Boiler Room

Boiler Room

A 90 MW heat plant cleared for the building permit: full structural design and BIM coordination of old and new.

Read

Heavy connection

Heavy connection

A simple connection in a decidedly unsimple structure: 3,400 tonnes transferred from a concrete tower to a steel base frame.

Read

Metal fatigue – the Comet case

Metal fatigue – the Comet case

Eighteen months in service were enough to crack a window corner. That is why aircraft windows are rounded today.

Read

Ferrybridge Power Station

Ferrybridge Power Station

On 1 November 1965 three of eight cooling towers collapsed. The cause: Kármán vortices shed by the towers that survived.

Read

Chrome line

Chrome line

A plating line for the automotive industry in Bilbao: laser survey of the hall, new structure carried by existing crane beams.

Read

Bonded membrane

Bonded membrane

Bonded mounting plates fix PV modules to a waterproofing membrane and cut the weight of the system on the roof.

Read

Production platform

Production platform

Step two of the project: shop drawings. This time the level of detail went well beyond the everyday.

Read

Photovoltaic

Photovoltaic

Ballast must not overload the roof, nor let go in a gust. The roof is split into zones and the mass comes from our calculator.

Read

Sequence of assembly

Sequence of assembly

Why a structure that is safe once finished can be unsafe while it is going up.

Read

Column reinforcement

Column reinforcement

The client removed one of the columns and let us look inside. What it revealed about the actual reinforcement layout.

Read

Fatigue strain

Fatigue strain

A smaller plate, lower stress. Smoothing the bracket corner spreads the stress instead of piling it up in one point.

Read

MESTIL – client satisfaction survey

MESTIL – client satisfaction survey

We decided to see ourselves through our clients’ eyes. What came out of the satisfaction survey run in spring 2021.

Read

Have a project that needs a structural engineer?

We answer enquiries in Polish, English and German.